Work is continuing on the windows of the main school. All with social distancing and health and safety in mind of course.
You can see that some of the window frames are also being replaced on the south side of the main school. Joe and Rebecca have crafted new frames for some of the windows of those that were rotten. Others that were in a better state of repair have been thoroughly sanded down and primed, ready to be painted in a sage green called Potting Shed from the Crown range.
Joe and Rebecca’s craftsmanship and attention to detail is stunning. You can see more of their work on Joe’s Facebook Page.